美女黄色av-国内精品久久人妻朋友-男女视频一区-亚洲高清成人-黑人巨大猛交丰满少妇-免费黄色在线播放-一本久道综合在线无码88-国产无套精品-秋霞av在线露丝片av无码-国产精品无码av片在线观看播放-少妇浴室愉情韩国理论-久草加勒比-中文字幕一区二区人妻性色-黄色片免费-国产成人综合久久三区-久久久国产精品无码免费专区-看日本毛片-天天色官网-精品露脸国产偷人在视频-国内毛片毛片毛片毛片毛片

中文

Kunming Konggang Waste-to-Energy Plant Phase II Project Officially Signed


On May 20, the signing ceremony of Kunming Konggang Waste-to-Energy Plant Phase II Project was held at Sanfeng Environment Headquarters. Wei Qian, Deputy Secretary and Director of the Party Working Committee of the Kunming Konggang Economic Zone Management Committee, and the heads of relevant departments, Sanfeng Environment Party Committee Secretary and Director Chairman Lei Qinping, Deputy Secretary of the Party Committee and General Manager Wang Xiaojun, and Deputy General Manager Wang Jiahong attended and witnessed the signing ceremony.

image.png

The design processing capacity of the project is 800 tons/day. It adopts the process of total waste incineration + semi-dry and dry flue gas purification + residual sanitary landfill. It is equipped with a mechanical grate furnace of 800 tons/day and a 20MW medium temperature sub-high pressure steam turbine generator set. The franchise period is 30 years (including a 2-year construction period). Counting the Phase I project of Kunming Konggang Waste-to-Energy Plant that also invested and constructed by Sanfeng Environment (completed and put into operation in 2012) in, the processing scale of the Phase II project will reach 1,800 tons/ day, effectively guaranteeing the “reduction, recycling and harmlessness” treatment of local domestic waste, and fully meeting the needs of urban development.

After the signing ceremony, the two parties had in-depth discussions and exchanges on the project construction and further government-enterprise cooperation. Wei Qian expressed his gratitude and affirmation to Sanfeng Environment, and said that all bureaus of the management committee would fully cooperate to promote the construction of the second phase of the project. He also hoped that with the continuous development of the Konggang Economic Zone, the two sides could cooperate in other projects such as medical waste treatment and further broaden the scope of cooperation between the two parties.

image.png

Before the signing ceremony, Wei Qian and his delegation also visited the manufacturing base and operation control center of Sanfeng Environmental Headquarters, and spoke highly of Sanfeng Environment equipment manufacturing and intelligent management and control.


Address: 3 Jianqiao Avenue, Jianqiao Industrial Park, Dadukou District, Chongqing, China Tel:(+86) 8805 5666

Chongqing Sanfeng Environment Group Corp. Ltd. All Rights Reserved 渝ICP備50010402000216號